
2 Ton Loading Capacity Bucket -Tipping Mine Wagons, Kfu1.0-6 Coal Mining Rail Car
It’s suitable for loosening & fastening the tie bolt & nut of railway track. With features of powerful impact force and integrated operating system, it can supply the demand of the locking torque to fasten the rail fastenings conveniently and quickly. It adopts a traveling unit with 4 rotary wheels at the base. Therefore, it’s suitable for traveling on land as well as on rail with good mobility. It’s an ideal special tool to loosen & fasten the tie bolt & nut replacing the heavy manual labor.
- Product Introduction
Product Description
Internal Combustion Rail Bolt Wrench suitable for loosening & fastening the tie bolt & nut of railway track. With features of powerful impact force and integrated operating system, it can supply the demand of the locking torque to fasten the rail fastenings conveniently and quickly. It adopts a traveling unit with 4 rotary wheels at the base. Therefore, it's suitable for traveling on land as well as on rail with good mobility. It's an ideal special tool to loosen & fasten the tie bolt & nut replacing the heavy manual labor.
According to the requirements of ergonomic design theory parameters, so that the operating mechanism is more applicable to prevent excessive bending caused by the operation.

The output tightening torque range of this machine is large, and it can be easily adjusted for predetermined in accordance with the operational requirements, accurate and stable. The nut sleeve adopts universal floating connection, so that the sleeve can be conveniently snapped into the bolts and nuts of the railway sleeper. In the operation, when the sleeve and sleeper bolts and nuts are jammed, the sleeve can be easily and quickly separated from the main body of the equipment, so that the main body can be quickly lifted outside the railway limit to ensure the safety of the construction work.
The reverse torque of this machine is very large, up to 300N-m, which can loosen all kinds of rusty bolts. At the same time to change the impact torque for static torque, so that the operation of the rail fastener pressure error is reduced; flexible direction change, centralised control, simple operation, easy to carry, high efficiency.


International cooperation:

CE certificate

Main Technical Data
1. Main shaft rev.: 780r/min
2. Max. loosening torque: ≥300 N•m
3. Max. fastening torque: ≥150 N•m
4. Working efficiency: ≤10个/min
5. Petrol engine:
(1) Model:GX160
(2) Rated power: 4.0KW
(3) Rated speed: 3600r/min
6. Machine weight: 60kg
7. Overall size:1300×510×760mm
Over the years, our company has been insisting on the spirit of 'quality for survival, credit promotion and development' in 2 Ton Loading Capacity Bucket -Tipping Mine Wagons, Kfu1.0-6 Coal Mining Rail Car production and marketing, continuously improving the quality of products and providing after-sales service. In order to cater to the fierce market competition environment, our company makes every effort in the management thought, management mode and management process. We adhere to the business philosophy of customer first, mutual benefit and market first, give full play to the advantages of talents, information and cost-effectiveness, make excellence, and continuously improve the professional level and service quality.
Hot Tags: Internal Combustion Rail Bolt Wrench for railway, China, manufacturers, suppliers, made in China, Electric Railway Grinding Device, industrial railroad tool, special track spanner, railway track refurbishing, high quality track wrench, rail gap management equipment







