What are the big waist and small waist of railway rails?

Jun 23, 2025|

To facilitate the identification of different sections of a single rail, the rail is typically divided into several zones along its longitudinal axis using the terms "small waist," "joint," and "large waist," as shown in the figure below. Generally, the section spanning 4 to 6 sleepers at the rail end is referred to as the "small waist"; the section spanning 3 sleepers at the rail end is referred to as the 'joint'; and the remaining central section, excluding the joint and small waist, is referred to as the "large waist." 󠄐󠄹󠅀󠄪󠄡󠄡󠄦󠄞󠄢󠄣󠄡󠄞󠄢󠄤󠄣󠄞󠄦󠄤󠄬󠅒󠅢󠄟󠄮󠄐 󠅅󠄹󠄴󠄪󠄡󠄬󠅒󠅢󠄟󠄮󠄾󠅑󠅝󠅕󠄪󠄡󠄣󠄢󠄧󠄩󠄡󠄩󠄧󠄩 󠄧󠄩󠄬󠅒󠅢󠄟󠄮󠇘󠆭󠆘󠇙󠆝󠅵󠇗󠆭󠆁󠄐󠇗󠅹󠅸󠇖󠆍󠅳󠇖

info-747-138

󠅹󠅰󠇖󠆌󠅹󠄬󠅒󠅢󠄟󠄮 Two inspections were conducted on each 12.5 m section of steel rail, specifically at the joints and at the midpoint of the rail length (commonly referred to as the "big waist");

For tracks with 25-meter-long rails, inspect four locations: the joint, one-quarter of the rail length (commonly known as the "small waist"), one-half of the rail length (commonly known as the "large waist"), and three-quarters of the rail length (commonly known as the "small waist"); 󠄐󠄹󠅀󠄪󠄡󠄡󠄦󠄞󠄢󠄣󠄡󠄞󠄢󠄤󠄣󠄞󠄦󠄤󠄬󠅒󠅢󠄟󠄮󠄐 󠅅󠄹󠄴󠄪󠄡󠄬󠅒󠅢󠄟󠄮󠄾󠅑󠅝󠅕󠄪󠄡󠄣󠄢󠄧󠄩󠄡󠄩󠄧󠄩 󠄧󠄩󠄬󠅒󠅢󠄟󠄮󠇘󠆭󠆘󠇙󠆝󠅵󠇗󠆭󠆁󠄐󠇗󠅹󠅸󠇖󠆍󠅳󠇖 󠅹󠅰󠇖󠆌󠅹󠄬󠅒󠅢󠄟󠄮

For non-standard tracks, the base length shall not exceed 6.25 m, depending on specific circumstances; 󠄐󠄹󠅀󠄪󠄡󠄡󠄦󠄞󠄢󠄣󠄡󠄞󠄢󠄤󠄣󠄞󠄦󠄤󠄬󠅒󠅢󠄟󠄮󠄐 󠅅󠄹󠄴󠄪󠄡󠄬󠅒󠅢󠄟󠄮󠄾󠅑󠅝󠅕󠄪󠄡󠄣󠄢󠄧󠄩󠄡󠄩󠄧󠄩 󠄧󠄩󠄬󠅒󠅢󠄟󠄮󠇘󠆭󠆘󠇙󠆝󠅵󠇗󠆭󠆁󠄐󠇗󠅹󠅸󠇖󠆍󠅳󠇖 󠅹󠅰󠇖󠆌󠅹󠄬󠅒󠅢󠄟󠄮

Long rail tracks are considered joints, similar to standard tracks, with four measurements taken per 25m rail; 󠄐󠄹󠅀󠄪󠄡󠄡󠄦󠄞󠄢󠄣󠄡󠄞󠄢󠄤󠄣󠄞󠄦󠄤󠄬󠅒󠅢󠄟󠄮󠄐 󠅅󠄹󠄴󠄪󠄡󠄬󠅒󠅢󠄟󠄮󠄾󠅑󠅝󠅕󠄪󠄡󠄣󠄢󠄧󠄩󠄡󠄩󠄧󠄩 󠄧󠄩󠄬󠅒󠅢󠄟󠄮󠇘󠆭󠆘󠇙󠆝󠅵󠇗󠆭󠆁󠄐󠇗󠅹󠅸󠇖󠆍󠅳󠇖 󠅹󠅰󠇖󠆌󠅹󠄬󠅒󠅢󠄟󠄮

For the transition curve (including straight sections with a gentle slope), continue measuring the track gauge and horizontal alignment at a distance of 6.25 m, and place the measuring rod as close as possible to the point where the slope becomes gentle. 󠄐󠄹󠅀󠄪󠄡󠄡󠄦󠄞󠄢󠄣󠄡󠄞󠄢󠄤󠄣󠄞󠄦󠄤󠄬󠅒󠅢󠄟󠄮󠄐 󠅅󠄹󠄴󠄪󠄡󠄬󠅒󠅢󠄟󠄮󠄾󠅑󠅝󠅕󠄪󠄡󠄣󠄢󠄧󠄩󠄡󠄩󠄧󠄩 󠄧󠄩󠄬󠅒󠅢󠄟󠄮󠇘󠆭󠆘󠇙󠆝󠅵󠇗󠆭󠆁󠄐󠇗󠅹󠅸󠇖󠆍󠅳󠇖 󠅹󠅰󠇖󠆌󠅹󠄬󠅒󠅢󠄟󠄮

 

If you wanna to get more knowledage, please contact me:

info-1236-740

 

Alina Shen

Jinzhou Tiegong Railway Maintenance Machinery Co.,Ltd.

E-mail: jztg0115@163.com / alina@tiegong.net

M.P/Wechat/Whatsapp:+86-18341633378

Mobile: +86-15041639960

Web: https://www.tiegongcn.com

Send Inquiry