Mailjztg02@vip.163.com
Phone+86-416-7996209
enLanguage
  • English
  • Português
  • Deutsch
  • Français
  • русский
  • Italiano
  • 日本語
  • عربي
  • Español
RectangleJinzhou Tiegong Railway Maintenance Machinery Co.,Ltd
Nav
  • Advanced Search
  • Home
  • About Us
  • Products
    • Rail Tamping Series
    • Rail Grinding Series
    • Rail Lifting And Lining Series
    • Rail Tamping Series
    • Rail Lifting & Lining Series
    • Rail Wrench Series
    • Rail Stretching and Rail Gap Adjusting Series
    • Rail Straightening Series
    • Rail Welding Series
    • Rail Car Series
    • Railway Tools
    • Rail Cutting Machine Series
    • Rail Drilling Machine
    • Pipe
    • Rail Bender Series
    • Truck Crane
    • Sleeper
    • Rail Crane System
    • Railway Excavator Attachment Series
  • Equipment News
    • Railway knowledge
    • Railway News
    • Coiled tubing
    • Company News
  • Knowledge
    • Rail Grinding Works and Equipment Series
    • Rail Cutting Works and Equipment Series
    • Rail Lamps
    • Railway Knowledge
    • Rail Bolt Wrench
    • tamping machine
    • rail bender
    • Rail temperature
  • Contact Us
  • Blog
  • Feedback
  • VR
Search
Banner
Home /

Knowledge

hot knowledges
  • Analysis of the causes of aluminium heat welding defects in steel rails and p...

    Analysis of the causes of aluminium heat welding defects in steel rails and p...

    DateMay 09, 2025
  • What exactly is the difference between 60 kg/m rails and 60 N rails?

    What exactly is the difference between 60 kg/m rails and 60 N rails?

    DateJun 27, 2026
  • rail stress relief and seamless long rail relaying

    rail stress relief and seamless long rail relaying

    DateMay 06, 2026
CONTACT US
  • Location1No. 837, Xingshan Street, ETDZ, Jinzhou City, Liaoning Province, China
  • phone1+86-416-7996209
  • mail2jztg02@vip.163.com
  • Introduction to the Pile Breaking Method for Railway Curve Normal Vector Piles
    Date2025-7-18

    Introduction to the Pile Breaking Method for Railway Curve Normal Vector Piles

    Common stakeout methods 1. Fixed point method: Start from a designated position (where the measuring rod is placed) and break points at both ends of the curve (where the curve transitions from curve
  • What is Track Quality Index(TQI)?
    Date2025-7-01

    What is Track Quality Index(TQI)?

    👉What is Track Quality Index(TQI)? TQI is a quantitative measure of the condition of a railway track. It refers to several aspects such as alignment, direction, track gauge, superelevation, and twis
  • What are the big waist and small waist of railway rails?
    Date2025-6-23

    What are the big waist and small waist of railway rails?

    To facilitate the identification of different sections of a single rail, the rail is typically divided into several zones along its longitudinal axis using the terms “small waist,” “joint,” and “large
  • Various connection forms of rail joints
    Date2025-6-18

    Various connection forms of rail joints

    In common lines, rails are connected with clamps and bolts, which are called rail joints. Rail joint connection parts are composed of clamps, bolts, spring washers, etc. Its function is to connect rai
  • Causes of railway track swaying
    Date2025-6-10

    Causes of railway track swaying

    With the development of the national economy, China's railway system has entered an era of rapid development, facing the operation of high-speed heavy-load trains, which has placed higher demands on t
  • Do you know the rail grinding procedure?
    Date2025-5-24

    Do you know the rail grinding procedure?

    The rail grinding operation group consists of 10 people, the specific division of labour is as follows: 1 person as the operation leader, co-ordination of pre-operation workload survey, on-site comma
  • Do you know -Cant
    Date2025-5-23

    Do you know -Cant

    Cant* : is amount by which one running rail is raised above the other running rail. it can be +ve or -ve according to which one of the inner and outer rails is above the other one. Negative cant is un
  • Causes and remediation of railway line shaking
    Date2025-5-23

    Causes and remediation of railway line shaking

    Smooth and safe operation of trains is the basic requirement of railway transport. Train comfort, high speed, heavy load is the railway development of railway technology and equipment put forward high
  • Definition, hazards and formation of rail wave abrasion rail corrugation grin...
    Date2025-5-17

    Definition, hazards and formation of rail wave abrasion rail corrugation grin...

    Rail wave wear referred to as rail wave wear, is a major type of rail damage. Rail wave abrasion refers to the rail head tread along the length of the cyclical uneven hook plastic deformation and wea
  • Causes and treatment methods of turnout guardrail defects
    Date2025-4-22

    Causes and treatment methods of turnout guardrail defects

    With the increase in the speed of conventional railways, the requirements for the professionalization and refinement of maintenance are getting higher and higher. Some employees are not aware of the d
  • Railway line classification
    Date2025-4-01

    Railway line classification

    Railway lines are mainly divided into main lines, station lines, section lines, branch lines, special-purpose lines (including safety lines, arrival and departure lines, freight lines, and pull-out li
  • What is the use of railroad sleeper?
    Date2025-3-26

    What is the use of railroad sleeper?

    What is the use of railroad sleeper? The appearance of the rail sleeper, is an important component of the railroad line accessories, but often overlooked as "invisible man", it plays a support rail, t
First 1234567 Last 2/22

Contact Us

  • LocationNo. 837, Xingshan Street, ETDZ, Jinzhou City, Liaoning Province, China
  • Phone+86-416-7996209
  • Eail1jztg02@vip.163.com

Quick Navigation

  • Home
  • About Us
  • Products
  • Equipment News
  • Knowledge
  • Contact Us
  • Showroom
  • Blog
  • Feedback
  • VR
  • Sitemap

Categories

  • Rail Tamping Series
  • Rail Grinding Series
  • Rail Lifting And Lining Series
  • Rail Tamping Series
  • Rail Lifting & Lining Series
  • Rail Wrench Series
  • Rail Stretching and Rail Gap Adjusting Series
  • Rail Straightening Series
  • Rail Welding Series
  • Rail Car Series
  • Railway Tools
  • Rail Cutting Machine Series
  • Rail Drilling Machine
  • Pipe
  • Rail Bender Series
  • Truck Crane
  • Sleeper
  • Rail Crane System
  • Railway Excavator Attachment Series

Inquiry

For inquiries about our products, please leave your E-mail to us and contact us within 24 hours.
Inquiry now
Copyright © Jinzhou Tiegong Railway Maintenance Machinery Co.,Ltd All Rights Reserved.